[edit] Introduction
A flood risk assessment is required for most developments within one of the flood zones.
This includes developments that are:
- In flood zone 2 or 3 including minor development and change of use.
- More than 1 hectare (ha) in flood zone 1.
- Less than 1 ha in flood zone 1, including a change of use in development type to a more vulnerable class (for example from commercial to residential), where they could be affected by sources of flooding other than rivers and the sea (for example surface water drains, reservoirs).
- In an area within flood zone 1 which has critical drainage problems as notified by the Environment Agency.
It is not necessary to carry out a flood risk assessment for a development that is less than 1 ha in flood zone 1 unless it could be affected by sources of flooding other than rivers and the sea, for example surface water drains.
You can find out more at: https://www.gov.uk/guidance/flood-risk-assessment-for-planning-applications
[edit] Home Quality Mark
For the purposes of the Home Quality Mark, a Flood Risk Assessment (FRA) or Flood Consequence Assessment (FCA) is defined as:
A study to assess the risk of a site flooding, and to assess the impact that any changes or development on the site will have on flood risk to the site and elsewhere. A FRA should be prepared according to relevant planning policy and technical guidance documents. The FRA must account for future climate change and detail any necessary adaptation measures where or if required. Where more than five years have passed since the FRA was carried out, evidence would be required to demonstrate that the basis of the FRA has not changed in that time. |
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
[edit] Related articles on Designing Buildings
- BREEAM Flood risk management.
- Building Research Establishment.
- Changing attitudes to property flood resilience in the UK
- Design flood event.
- Design flood level.
- Flood.
- Flood Risk Framework.
- Home Quality Mark.
- Flood and Water Management Act.
- Flood plain
- Flood risk
- Flood risk management plan
- Flood zone
- Flood defences
- Planning for floods.
- Property flood resilience
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..